Month: October 2012

Calls to Cut Australia's 20 Percent Renewable Energy Target Rejected

30 October 2012: Renewable Energy World Online: An independent body set up to consider Australia’s official target of generating 20 percent of its energy needs by 2020 from renewable sources has...Read More

Likusasa Portraz Project News

Likusasa has designed and built 11 solar powered sites for the Posts and telecommunications regulatory of Zimbabwe (POTRAZ). These are large sites with an average power consumption of 17kW intended to...Read More

30 October 2012: Eskom and Nersa

4 October 2012: All documentation concerning the 30 October 2012 Eskom and Nersa meeting can be viewed / downloaded here: 30 October 2012: Eskom and Nersa 30 October 2012: Eskom Programme 30 October 2...Read More

16 October: NERSA Annual Report 2011/2

4 October 2012: The following documentation concerning the notices of parliamentary meetings can be viewed / downloaded here: 16 October: NERSA Annual Report 2011/2  

12 October 2012: Meeting with National Nuclear Regulator (NNR) and SA Nuclear Energy Corporation (NECSA)

4 October 2012: The following documentation concerning the notices of parliamentary meetings can be viewed / downloaded here: 12 October 2012: Meeting with National Nuclear Regulator (NNR) and SA Nucl...Read More

18 October 2012: SANEDI and Central Energy Fund Annual Report 2011/2

4 October 2012: The following documentation concerning the notices of parliamentary meetings can be viewed / downloaded here: 18 October 2012: SANEDI and Central Energy Fund Annual Report 2011/2

11 October 2012: Department of Energy (DoE) on their Annual Report 2011/12

4 October 2012: The following documentation concerning the notices of parliamentary meetings can be viewed / downloaded here: 11 October 2012: Department of Energy (DoE) on their Annual Report 2011/12...Read More

10 October 2012: Meeting with Auditor-General of SA and external expert on the performance of the DoE

4 October 2012: The following documentation concerning the notices of parliamentary meetings can be viewed / downloaded here: 10 October 2012: Meeting with Auditor-General of SA and external expert on...Read More

09 October 2012: Minister of Energy and Department of Performance Monitoring and Evaluation

4 October 2012: The following documentation concerning the notices of parliamentary meetings can be viewed / downloaded here: 09 October 2012: Minister of Energy and Department of Performance Monitori...Read More

The WTO vs. Ontario: Addressing the Bigger Picture of Trade and Renewable Energy

29 October 2012: Renewable Energy World Online: In a move that will likely set a worldwide precedent barring governments from imposing local content requirements to their feed-in tariff programs, a fo...Read More

SA moves to procure 7 761 MW of baseload IPP power by 2025

29 October 2012: Engineering News Online: Energy Minister Dipuo Peters reported on Monday that the Department of Energy (DoE) had received “concurrence” from the National Energy Regulator of South Afr...Read More

RENEWABLE ENERGY PROJECTS GET THE GREEN LIGHT

26 October 2012: RENEWABLE ENERGY PROJECTS GET THE GREEN LIGHT CAPE TOWN – The South African Photovoltaic Industry Association (SAPVIA) welcomes the notification from the Department of Energy to...Read More

  • 1
  • 2
  • 4

Lost Password

Register